What Is the Time Frame for Mobile App Development?

Mobile apps have become an integral part of our lives, providing us with endless opportunities to interact with each other, access information and engage with our favorite brands. However, creating a mobile app is a complex process that involves a lot of planning, designing, coding, testing, and launching. One of the most common questions that app development companies receive is: how long does it take to develop a mobile app? In this blog post, we will explore the factors that impact the timeline of mobile app development and provide you with an estimate of how long it may take to create an app.  

Factors That Impact the Timeline of Mobile App Development

The timeline of mobile app development depends on several factors, including:

  1. Complexity:

    The more complex the app, the longer it will take to develop. An app that involves a lot of features, functionalities, and integrations will take longer to develop than a simple app with limited features. The degree to which the mobile app developers comprehend your concept is crucial in determining the time frame. The developers can simply comprehend and carry out the plan if your idea is overly straightforward, such as merely a copy of any other software or something similar to the allpaper app. However, if you are creating an application with some novel and distinctive features, you must take extra time to make your point. And this is essential because better understanding leads to better results.

  2. Platforms:

    Developing an app for multiple platforms, such as iOS and Android, will take longer than developing an app for a single platform. Depending on the platform you select, the amount of time and work needed to create a fully functional app will vary. According to our experience, both platforms require a significant time commitment, although Android still requires more time. This is brought on by the difficulties in developing applications for a greater range of devices due to fragmentation. Even while Google has been improving and refining the Android Software Developers Kit (SDK) over time to handle a variety of screen sizes, OS versions, pixel densities, etc., the iOS platform still needs a lot of work before it can be overtaken. Similar to this, the Android platform takes less time to approve apps than the iOS platform.

  3. Design:

    The design phase is critical to the success of an app. The more time that is spent on design, the better the app will look and function. This phase involves creating wireframes, designing the user interface, and developing the user experience.  Design for mobile apps refers to the process of creating the visual and interactive elements of an application that users will see and interact with on their mobile devices. It includes both the user interface (UI) design and user experience (UX) design.

  4. Testing:

    Thorough testing is essential to ensure that the app works as expected and is free from bugs and glitches. Testing involves functional testing, performance testing, and user acceptance testing. 

    Testing for mobile apps is the process of evaluating and validating the functionality, performance, and user experience of an app on various devices and platforms. The testing process is critical to ensure that the app works correctly, meets the user's needs, and provides an optimal user experience.

  5. Team:

    The size and experience of the app development team will also impact the timeline. A larger team with more experience will be able to develop an app faster than a smaller team with less experience.

  6. Communication

    Client communication with the mobile application development company is essential for better results. The difficulties that arise during the development phase are likely to be resolved more slowly if the client and development team find it difficult to communicate owing to a time difference or any other problem. These pauses can lengthen the time it takes to develop an app.

    Our mobility specialists are always willing to go above and above to keep lines of communication open and the development process moving quickly.

  7. Targed audience:

    When opposed to those for a bigger audience, such as 50,000 users, developing a mobile app for a small number of concurrent users, such as 1000 users, includes less considerations. According to what we know, a larger audience application requires more architecture, infrastructure, performance testing, and tuning. All of these elements increase the time needed to create an app.

    We think that a software with no bugs and complete functionality will be more successful than one that crashes and is released earlier.

     How Long Does It Take to Develop a Mobile App?

The timeline of mobile app development varies depending on the factors discussed above. However, to give you an estimate, we can break down the development process into four phases:
 

1. Planning Phase (1-2 weeks)

 
The planning phase is where the idea for the app is conceived, and the project is defined. During this phase, the app development team will work with the client to identify the app's goals, target audience, features, and functionalities. The planning phase can take between 1-2 weeks, depending on the complexity of the app.
 

2. Design Phase (2-4 weeks)

 
The design phase is where the app's user interface and user experience are developed. This phase involves creating wireframes, defining the app's layout, and designing the visual elements of the app. The design phase can take between 2-4 weeks, depending on the complexity of the app and the level of detail required.
 

3. Development Phase (8-12 weeks)

 
The development phase is where the app's code is written and the app's functionality is developed. During this phase, the app development team will use programming languages such as Java, Swift, or Kotlin to build the app's functionality. The development phase can take between 8-12 weeks, depending on the complexity of the app and the number of features required.
 

4. Testing and Launching Phase (4-6 weeks)

 
The final phase of the app development process is the testing and launching phase. During this phase, the app is thoroughly tested to ensure that it is free from bugs and glitches. Once the app is approved, it is launched on the app store. The testing and launching phase can take between 4-6 weeks, depending on the complexity of the app and the time it takes to get the app approved by the app store.
 
Our Prestigious Clients
Client's Reviews
  MaxERP™ Software Solutions is the complete package. I cannot imagine anyone doing a better job than they have done for us.  
JAI HULSE
  I’ve already recommended MaxERP™ Software Solutions. Their team can jump right into a project and they’re easy to work with. They’re very knowledgeable and able to work without a lot of handholding.  
WHITNEY SCENEY
  Our experience with MaxERP™ Software Solutions team has been nothing short of outstanding. The management team is customer focused, while the development team is passionate in their work and a pleasure to work with. We are delighted to have such a good partner.  
REBEKA LEE
1850+
Total Projects
99%
Happy Customers
36+
Countries Covered
14+
Years of Experience
Why Choose Us?
A team of techie’s brains, one motive and tons of hard work to resolve every challenge that comes along makes us reliable to the fullest.
EXPERIENCE
MaxERP™ Software Solutions was founded in 2007 and we have designed more than 10,000 websites since then.
ACCOUNTABILITY
Our commitment to results and accountability drives every digital project that we take on.
TECHNOLOGY
We take responsibility for delivering forward-thinking websites that utilise cutting-edge technology.
METHODOLOGY
Our process and design methodology is what makes the MaxERP™ Software Solutions difference.